Cell:
231-557-4698 / E-mail: tenbrockd@msn.com
---- PROFILE ----
I have over 25 years of systems and manufacturing
experience. My strong Logistics involvement provides me a broad knowledge pool
to draw from. My SAP R/3 experience involves
both Configuration and Project Management. I have extensive experience in the SAP Quality Management and Materials
Management Modules, plus strong integration into Production Planning, Sales and
Finance.
---- PROFESSIONAL EXPERIENCE ----
SAP QM Lead Consultant 9/2007-Present
·
Elster American Meter (
Nebraska City
,
NE
) – SAP R/3 - Quality Management Lead – Key items: 4 month project, which
included 7 inspection types (Purchase Order Goods Receipts 01, Purchase Order
Goods Receipts First Article 0101, Stock Transfers 08, Outbound Deliveries 10
and Floor Audits and Production First Article 89). Vendor Release using Q-Info Records with Date
and Quantity Release, No Lot Trigger and First Article functionality. Defects Recording during inspection results
recording and full use of Quality Notifications for Customer, Vendor and
Internal Defects. Also included creating
a special CAPA/CAR notification type for corrective action/preventive action
and root cause analysis. Created Certificates of Compliance for outbound
deliveries.
SAP QM Lead Consultant 08/2007-09/2007
·
Kohler Kitchens and Batch (
Kohler
,
WI
) – SAP R/3 - Quality Management Lead – Key items: 2 month project to help expand
existing SAP QM functionality. Made
significant changes to the QM Notification processes by instituting better uses
of the Notification entry, Reporting and redesigning the forms which were sent
outside the company. Also created a new
Notification Type for Corrective Action/Preventive Action (CAPA) for correcting
trending failures and significant events to ensure they no longer occur. There were a number of smaller items worked
on during this time to help improve QM processes.
SAP QM/MM Lead Consultant 06/2007-08/2007
·
KiSolutions (
Irvin
,
CA
) – Working with a third party ePedigree (FDA Requirements) system to integrate
the package into SAP. This requires
identifying all the system touch points and triggers for passing data back and
forth between the two systems. Such a
system is complex requiring full project life cycle (BPP’s, full testing,
validation).
SAP QM Lead Consultant 06/2007-08/2007
·
Sud-Chemie (
Boston
,
MA
) – SAP R/3 - Quality Management Lead – Key items: 2 month project. Assisting with an SAP Quality Management
rollout which included Goods Receipt Inspections, Equipment Calibration
Inspections, Quality Notifications and Vendor Release using Quality Info
Records.
SAP MM Lead Consultant 02/2007-05/2007
·
Med-Health Pharmaceutical Products (
Las Vegas
,
NV
) – SAP R/3 – Materials Management – Key items: 3 month rapid implementation. Some of the items implemented in Materials
Management were Batch Management, Batch Determination, Purchasing, Inventory
Control, and Consumption Based Planning. Some of the key items were Requisition Release Procedures, Purchase
Contracts, Manufacturing Part Number and Quality Release. FDA regulated environment requiring Validation
throughout the project lifecycle.
SAP MM/QM Lead Consultant 06/2006-01/2007
·
OraSure Technologies (Medical Device) (
Bethlehem
,
PA
) – SAP R/3 – Materials Management/Quality Management Lead – Key items: 5 month
project. Some of the items implemented
in Materials Management were Batch Management, Batch Determination, Purchasing,
Inventory Control, Physical Inventory and Consumption Based Planning. Some of the items in Quality Management were
3 Inspection Types (PO Goods Receipt Inspection, Production Goods Receipt Inspection
and Stock Transfer Ins). Also, the use
of Vendor Release using Quality Info Records. FDA regulated environment requiring Validation throughout the project
lifecycle.
SAP QM Lead Consultant 01/2006-5/2006
·
Advance Electronics (
Chicago
,
IL
) – SAP R/3 – Quality Management Lead – Key items: Use of Production Goods
Receipt Inspections (04) using Early Lot functionality. Additional features
include Inspection Points, Defects Recording, PPM and SPC. Designed interfaces using QMIDI function
modules to receive test results from shop floor automated test equipment. Use of SAP BW with QM info cubes. Designed custom BW/QM extract specifications
to retrieve additional key data during R/3 to BW data population. Also, the use of BW BEx query functionality
using standard queries and designing custom queries.
Validation Lead Consultant 05/2006-5/2006
·
Leica Microsystems (Medical Device) (
Chicago
,
IL
) – Conducted a system audit for a CAPA (Corrective and Preventive Action) system
in a validated environment. The guidance
used for conducting the audit was regulations 21CFR11, 21CFR820.100 and 21CFR820.198. Some of the items audited were the Validation
Plan, Validation Procedure, Validation Report, User Specifications, Program
Specifications, Completed Test Scripts, relevant SOP’s and testing the system
functionality against the above regulations.
SAP QM/MM Lead Consultant 03/2005-01/2006
·
King Pharmaceutical (
Bristol
,
TN
) – SAP R/3 – Quality Management and Materials Management Lead – Key items:
Provided go-live support for plant rollouts which included issues resolution
and master data load validations. Also
provided day to day production support for plants already live and recommendations
for improvements to current processes. Also,
working on converting SAP Testing Scripts into an automated testing tool called
Mercury Quick Test. This included assisting
in the development of SOP’s and protocols for designing and managing the
automated test scripts.
SAP QM Lead Consultant 09/2004-02/2005
·
Perrigo Pharmaceutical (
Allegan
,
MI
) – SAP R/3 – Quality Management Lead – Key items: Designed CAPA (Corrective Action
Preventive Action) system using SAP Quality Notifications. Notification Types: Internal and External Unplanned Deviations
along with Long Term Corrective Actions. Also delivered a Retain Sample solution using SAP Sample Management. All processes (business requirements,
enhancement specifications, functional verifications, training, and
authorizations) had to be validated using internal validation standards.
SAP QM Lead Consultant 03/2004-08/2004
·
Sigma/Aldrich Chemical (
St Louis
,
MO
) – SAP R/3 – Quality Management Lead – Key items: Designed interface between
SAP QM and external LIMS using QM-IDI interface Function Modules. Interface sent inspection data from SAP QM to
external LIMS. Once testing completed in
LIMS, the test results were passed back to SAP along with Inspection Point
Confirmations and Usage Decisions.
SAP QM Lead Consultant 08/2003-02/2004
·
Sud-Chemie (
Louisville
,
KY
) – SAP R/3 - Quality Management Lead – Key items: 6 month project, which
included 5 inspection types (PO Goods Receipt Inspection, Production In-Process
Ins, Production Goods Receipt Ins, Stock Transfer Ins and Miscellaneous
Ins). Heavy use of In-process
Inspections using PP/PI with QM Inspection Points. Batch Managed environment with Batch
Classification being populated from the Inspection Lot results. Other functionality implemented: SPC, Long
Term Characteristics and Defects Recording.
SAP QM/MM Lead Consultant 12/2002-07/2003
·
Karl Storz Endovision (2nd Rollout) (Medical Devices) (
Boston
,
MA
) – SAP R/3 – Quality
Management and Materials Management Lead – Key items: ASAP 7 month
project. Some of the items implemented
in Materials Management were Batch Management, Serial Number Control, Split
Valuation, Purchasing Contracts, MRP, and Requisition Release Procedures. Some of the items in Quality Management were
5 inspection types (PO Goods Receipt Inspection, Production In-Process Ins,
Production Goods Receipt Ins, Returns Ins, and Stock Transfer Ins). Also, Vendor Release, Defects Recording and
Test Equipment Management. FDA regulated
Medical Device manufacturer, processes had to be validated throughout the
project.
SAP QM Lead Consultant 10/2002-11/2002
·
Degussa Chemical (
Parsippany
NJ
) – SAP R/3 – Provided extensive Quality Management Training for a major SAP
implementation. This included tailoring
the training material and schedule to the actual functionality being
implemented by the company.
SAP QM Lead Consultant 02/2002-09/2002
·
Karl Stortz Imaging (1st Rollout)
(Medical Devices) (Santa Barbara, CA) – SAP R/3 – Quality Management Lead –
Key items: ASAP 8 month project, which included 5 inspection types (PO Goods
Receipt Inspection, Production In-Process Ins, Production Goods Receipt Ins,
Audit Ins, and Stock Transfer Ins). Designed
CAPA (Corrective Action Preventive Action) system using SAP Quality
Notifications (Defect Locations, Defects, Causes, Activities and Solution
Database). Also, Vendor Release using
Quality Info Records, Serial Number Control and Test Equipment Management. FDA regulated Medical Device manufacturer,
processes had to be validated throughout the entire project.
SAP QM/PP Lead Consultant 05/2001-01/2002
·
BD Biosciences (Bio Tech) (San Diego, CA) -SAP R/3 – Quality Management Lead – Key items: ASAP 8 month project, which
included 5 inspection types (PO Goods Receipt Inspections, Production Goods
Receipt Ins, Production In-Process Ins, Audit Ins and Misc Goods Receipt Ins)
for all Make Items and key Raw Materials. Also, use of Batch Management, Batch Determination during Delivery and
Vendor Release using Quality Info Records.
SAP QM Lead Consultant 01/2000-03/2001
·
Corn Products International (Food) (
Chicago
,
IL
)
Phase II – SAP R/3 - Quality Management Lead – Key items: ASAP project,
full scope Quality Management, this included activating 6 inspection types (GR
PO Inspections, GR Production Ins, Stock Transfer Ins, Returns Ins, Recurring
Ins, and Shipping Ins) for all Finished Goods Materials. Also included Batch Determination during
Delivery, Quality Notifications, Certificate of Analysis and Expiration Date
Control. This included 6 manufacturing
plants in the
US
and
Canada
,
impacting over 400 users.
SAP MM Lead Consultant 03/1999-12/1999
·
Corn Products International (Food) (
Chicago
,
IL
)
Phase I – SAP R/3 - Materials Management Lead – Responsible
for Purchasing, Inventory Control and Material Requirements Planning. Key items: ASAP 9 month project, Purchase
Contracts, split valuation, consumption based planning, plants in multiple
countries and requisition release procedures.
SAP QM/MM Lead Consultant 02/1999-02/1999
·
Holnam Cement – (
Ann Arbor
,
MI
) - SAP R/3 – Quality Management Lead – Key items: Delivered a full business
model for the client, which was used to determine if they would conduct the
full-scale project. During this phase we
conducted full blueprinting. We then
developed a full business model on SAP for a client playback. My scope was Purchase Order Goods Receipt
Inspections, Production Goods Receipt Inspections and Quality Notifications.
SAP MM Lead Consultant 07/1998-01/1999
·
Mahle (
Morristown
,
TN
) – SAP R/3 - Materials
Management Lead – Mahle produces Engine Pistons and Cylinders. Responsible for Purchasing, Inventory Control
and Material Requirements Planning. Key
items: ASAP 6 month project, plants in multiple countries, stock transport
orders, consumption based planning, split valuation, and batch management.
SAP MM Lead Consultant 06/1998-06/1998
·
HMR Pharmaceutical (
Kansas
City
,
MO
) – SAP R/3 – Provided
assistance in getting Batch Management/Batch Determination triggers performing
properly. Also, conducted advanced
Classification training.
Whittman-Hart,
Inc. 09/1997-05/1998
SAP QM Lead
Consultant
·
Ball Seed Horticulture (
Chicago
,
IL
) – SAP R/3 – Quality
Management Lead - Designed CAPA
(Corrective Action Preventive Action) system using SAP Quality Notifications. This
design focused on Customer Complaints and the short/long term corrective actions.
·
Electrocom (
Dallas
,
TX
) – SAP R/3 – Quality
Management Lead - Responsible for implementing the Quality Management
module. Electrocom manufactures mail
sorting equipment for the US Postal Service. Key items: purchase goods receipts
inspections, dynamic modification, process audits throughout the shop
floor.
Plaut Consulting 08/1996-08/1997
SAP QM/MM Consultant
·
Sigma/Aldrich Chemical (
St
Louis
,
MO
) – SAP R/3 – Materials
Management Consultant. Responsible for Batch Management and Inventory
Control. Key items: Batch Determination
during shipping, multiple plants, consumption based planning, and physical
inventory.
·
Quality Management Instructor (
SAP
Partner
Academy
,
Boston
MA
.) – Instructor for two-week
SAP QM Certification Course. This
included writing the two-week certification course (instructor guide, demo
notes, student handouts, and exam).
Harrow Industries, Inc. 1987-1996
Project
Manager
·
Responsible for directing special projects and ensuring existing
systems run smoothly.
·
Managed a number of major system designs and implementations such as
Order Management, Shop Floor Control, Time & Attendance, Cabinet Dimension
Planner and numerous other systems.
·
Managed multiple projects over several divisions, which involved
coordinating deliverables with various teams.
Bennett Pump
Company 1984-1987
Analyst/Programmer
·
Responsible for systems analysis, programming, and training of
manufacturing computer systems.
United States
Marine Corps 1976-1984
·
Computer Programmer - (2 years)
·
Supply (Warehouse Chief) - (3 years)
·
Security - (2 years)
---- EDUCATION ----
Muskegon
Community College
- Associate in Science
Certification in Production
and Inventory Management (CPIM APICS)
---- SAP CERTIFICATIONS ----
Certification in SAP R/3 Quality Management
Certification in SAP R/3 Materials Management